Skip to main content
After having all anchors connected and installed to the network, follow the below steps to start the RTLS Hub software
  1. Ensure that all anchors are connected and online in network.
  2. Next, use floor planner tool to create new floor plan designs, draw walls and accurately scale the image
  3. First step after adding floor plans is to set a Master Anchor.
    1. Select the anchor
  4. After selecting the Master(s), go ahead and define the slave anchors and their respective masters.
  5. If your use case involves 2D tags at the same height, we recommend defining Z-Axis at same height for the anchors.
After having the RTLS Hub software running, tags and anchors installed, you can start to configure the RTLS System.